Brickwork Quality Control

Here I’ve listed the most important factors which are to be taken care of while doing Brickwork of any nature structural brickwork or face lifting works in brickwork for better appearance and Brickwork Quality Control. These points mentioned below should always be taken care strictly in the site of construction for achieving a long lasting durable structure.

Brickwork Quality Control

Brickwork Quality Control Procedure :-

  1. The bricks should be of 1st class quality for structural works, or atleast of 2nd class quality in unavoidable circumstances, but those 2nd class bricks must posses atleast 60% of the field quality checks of bricks.
  2. The bricks should be immersed in water for a continuous period of 2 hrs for best results, or atleast 1 hr for satisfactory results, but anything less than this can cause total loss of bond strength of the mortar due to the absorption of water from the mortar to the water hungry dry bricks.
  3. Brickwork should be done for a maximum height of 1.5 m in a day, and nest continuation should be started only after the brickwork previously done achieves sufficient strength to hold the load without squeezing out of the mortar from the newly prepared brick joints of brickwork.
  4. In case of doing brickwork of half brick thick brick walls or construction of brick on edge like 5″, 3″ or 4″ wall construction H.B. Netting should be done on every third layer, or the wall may fall down.
  5. Mortar should be of proper proportion and consistency as required for different types of brickwork.
  6. The mortar which has been prepared must be used within its Initial Setting Time, that is  a period of 30 minutes for OPC and Blended Cements like PPC, PSC.
  7. Brickwork should be cured well for a period of atleast 7 days for good results.
  8. Brickwork should be raised in a manner of uniform level in height throughout its length, suppose  a wall is to be raised on the next layer of brickwork, then it should be done only after finishing the brickwork throughout the length in the current layer.
  9. Brickwork should be done in proper bonding.
  10. In Brickwork there must not be vertical joints in continuation, it must be be alternatively arranged by atleast overlapping one fourth portion of the brick above and below.
  11. Nothing less than Half Bats shall be used.
  12. Connection between two walls of different alignment must be done with toothing in brickwork.

Add Comment

Flat Slab and Ribbed or Waffle Slab Secrets
Foundation Failure
Foundation Failure Causes and Remedies
Civil Engineering Interview Question
Civil Engineering Interview Questions Top 10
Septic Tank Drawing
Septic Tank Design Easily 5 Minutes
Sand
Field Tests Of Building Materials
Cube Testing Mould
Concrete Cube Test To Determine Concrete Strength
Water Absorption Test
Water Absoption Test Of Bricks – Laboratory Method
Brick Test
The Brick Test For Quality Assurance
Waterproofing Compound
Home Made Waterproofing Compound
Brick Wall
Brickwork Quality Control
Ready Mixed Concrete
Ready Mix Concrete A Approach To Modern Concreting
Isolated Column Footing
Shallow Foundation Of Different Types And Their Selection
Long Column Design
Design of Long Column Step By Step Guide Fastest Technique
Steel Column Beam Connection
Design Of Steel Beam Guide Proven Fastest Technique
Columns Formwork for Casting
Design of Column in Limit State Method
Shear Force Logo
What Is Shear Force And Bending Moment – Explained
How to reduce the curing period of concrete slabs
Concrete Compacting
Importance of Water in Concrete
Concrete Mix Design Water-Cement Ratio Curve
Concrete Mix Design Easy Guide As Per IS 10262-2009 With Example
Concrete Spalling
What is Quality Control of Concrete – Top 5 Extremely Important
Tutorial Logo
Online Civil Engineering Tutorial
AMIE vs B.Tech. or BE
Future Aheead Job
Researched Technique to get Government Job